SFI SYSTEM Fuel Injector Circuit

DESCRIPTION

The fuel injectors are located on the intake manifold. They inject fuel into the cylinders based on signals from the ECM.

WIRING DIAGRAM

A002B2KE04

CAUTION / NOTICE / HINT

Note

Inspect the fuses for circuits related to this system before performing the following procedure.

PROCEDURE


  1. CHECK TERMINAL VOLTAGE (POWER SOURCE OF FUEL INJECTOR ASSEMBLY)

    A002BB9C70
    *a

    Front view of wire harness connector

    (to Fuel Injector Assembly)


    1. Disconnect the fuel injector assembly connectors.

    2. Turn the ignition switch to ON.

    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      C25-1 - Body ground Ignition switch ON 11 to 14 V
      C26-1 - Body ground Ignition switch ON 11 to 14 V
      C28-1 - Body ground Ignition switch ON 11 to 14 V
      C29-1 - Body ground Ignition switch ON 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  2. INSPECT FUEL INJECTOR ASSEMBLY (INJECTION AND VOLUME)


    1. Inspect the fuel injector assembly.

      Click here

      Tech Tips

      Perform "Inspection After Repair" after replacing the fuel injector assembly.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  3. CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM)


    1. Disconnect the fuel injector assembly connector.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      C25-2 - C1-20 (#10) Always Below 1 Ω
      C26-2 - C1-17 (#20) Always Below 1 Ω
      C28-2 - C1-18 (#30) Always Below 1 Ω
      C29-2 - C1-19 (#40) Always Below 1 Ω
      C25-2 or C1-20 (#10) - Body ground Always 10 kΩ or higher
      C26-2 or C1-17 (#20) - Body ground Always 10 kΩ or higher
      C28-2 or C1-18 (#30) - Body ground Always 10 kΩ or higher
      C29-2 or C1-19 (#40) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  4. CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU - FUEL INJECTOR ASSEMBLY)


    1. Disconnect the fuel injector assembly connector.

    2. Disconnect the semiconductor pwr integration ECU connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      C25-1 - 1G-3 Always Below 1 Ω
      C26-1 - 1G-3 Always Below 1 Ω
      C28-1 - 1G-3 Always Below 1 Ω
      C29-1 - 1G-3 Always Below 1 Ω
      C25-1, C26-1, C28-1, C29-1 or 1G-3 - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG