NETWORK GATEWAY ECU INSTALLATION

PROCEDURE


  1. INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)


    1. A00224Y

      Align the holes of the central gateway ECU (network gateway ECU) with the protrusions of the blower assembly and set the central gateway ECU (network gateway ECU) to the blower assembly.

    2. Install the 2 screws.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    3. Connect the central gateway ECU (network gateway ECU) connector.

  2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  3. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY

    Click here

  4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  5. INSTALL INSTRUMENT SIDE PANEL RH (for LHD)

    Click here

  6. INSTALL INSTRUMENT SIDE PANEL LH (for RHD)

    Click here

  7. INSTALL FRONT DOOR OPENING TRIM COVER RH (for LHD)

    Click here

  8. INSTALL FRONT DOOR OPENING TRIM COVER LH (for RHD)

    Click here

  9. INSTALL FRONT DOOR SCUFF PLATE RH (for LHD)

    Click here

  10. INSTALL FRONT DOOR SCUFF PLATE LH (for RHD)

    Click here

  11. INSTALL FRONT NO. 2 CONSOLE BOX INSERT (for LHD)

    Click here

  12. INSTALL FRONT NO. 1 CONSOLE BOX INSERT (for RHD)

    Click here

  13. INSTALL INSTRUMENT PANEL FINISH PANEL END RH (for LHD)

    Click here

  14. INSTALL INSTRUMENT PANEL FINISH PANEL END LH (for RHD)

    Click here

  15. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here