PROCEDURE
INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Align the holes of the central gateway ECU (network gateway ECU) with the protrusions of the blower assembly and set the central gateway ECU (network gateway ECU) to the blower assembly.
Install the 2 screws.
Connect the central gateway ECU (network gateway ECU) connector.
INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
INSTALL INSTRUMENT SIDE PANEL RH (for LHD)
INSTALL INSTRUMENT SIDE PANEL LH (for RHD)
INSTALL FRONT DOOR OPENING TRIM COVER RH (for LHD)
INSTALL FRONT DOOR OPENING TRIM COVER LH (for RHD)
INSTALL FRONT DOOR SCUFF PLATE RH (for LHD)
INSTALL FRONT DOOR SCUFF PLATE LH (for RHD)
INSTALL FRONT NO. 2 CONSOLE BOX INSERT (for LHD)
INSTALL FRONT NO. 1 CONSOLE BOX INSERT (for RHD)
INSTALL INSTRUMENT PANEL FINISH PANEL END RH (for LHD)
INSTALL INSTRUMENT PANEL FINISH PANEL END LH (for RHD)
CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.