BLIND SPOT MONITOR SENSOR INSTALLATION

PROCEDURE


  1. INSTALL BLIND SPOT MONITOR SENSOR LH


    1. Install the blind spot monitor sensor LH with the 3 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Replace the blind spot monitor sensor LH if it has been dropped or subjected to a severe impact.

    2. Connect the connector.

  2. INSTALL BLIND SPOT MONITOR SENSOR RH


    1. Install the blind spot monitor sensor RH with the 3 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Replace the blind spot monitor sensor RH if it has been dropped or subjected to a severe impact.

    2. Connect the connector.

  3. INSTALL REAR BUMPER ASSEMBLY

    Click here

  4. PERFORM BLIND SPOT MONITOR BEAM AXIS INSPECTION

    Click here

  5. PERFORM BLIND SPOT MONITOR BEAM AXIS CONFIRMATION

    Click here

    SST
    09870-60000   ( 09870-60010 )
    09870-60040
  6. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here