POWER STEERING ECU(for RHD) INSTALLATION

PROCEDURE


  1. INSTALL POWER STEERING ECU ASSEMBLY


    1. A011NXYC01
      *a Lock of the Lock Lever
      *b Lock Lever

      Connect the 3 connectors to the power steering ECU assembly.

      Tech Tips

      When connecting the connector with lock lever, as shown in the illustration, return the lock lever to its original position to connect the connector and securely push in the lock of the lock lever.

    2. Install the power steering ECU assembly with the 2 bolts.

      Torque:
      8.5 N*m  { 87 kgf*cm, 75 in.*lbf }
  2. INSTALL INVERTER WITH CONVERTER ASSEMBLY

    Click here

  3. ROTATION ANGLE SENSOR INITIALIZATION AND TORQUE SENSOR ZERO POINT CALIBRATION

    Click here

  4. ASSIST MAP WRITING

    Click here