SHIFT LEVER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY


    1. A0022WJN01

      Temporarily install the transmission floor shift assembly to the body with the 4 bolts.

      Note

      Do not pinch the wire harness.

    2. Fully tighten the 4 bolts in the order shown in the illustration.

      Torque:
      8.3 N*m  { 85 kgf*cm, 73 in.*lbf }
    3. Connect the shift lock control ECU connector.

      Note

      Be sure to securely connect the shift lock control ECU connector.

    4. Connect the 4 clamps to the transmission floor shift assembly.

    5. Connect the transmission control switch connector.

      Note

      Be sure to securely connect the transmission control switch connector.

  2. INSTALL NO. 1 CONSOLE BOX DUCT


    1. Install the No. 1 console box duct with the 2 clips.

    2. Connect the 2 clamps to the No. 1 console box duct.

  3. INSTALL CONSOLE BOX ASSEMBLY

    Click here

  4. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY


    1. A0022HLN01

      Turn the transmission control shaft lever counterclockwise until it stops, then turn it clockwise 2 notches.

    2. Move the shift lever to N.

    3. A00227KC02
      *a Lever
      B003YHT Pushing the lever rearward

      Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.

    4. Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.

      Torque:
      12.8 N*m  { 131 kgf*cm, 9 ft.*lbf }

      Note

      Do not push the lever of the transmission floor shift assembly too hard.

  5. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    Click here

  6. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)

    Click here

  7. INSPECT SHIFT LEVER POSITION

    Click here

  8. INSPECT FOR EXHAUST GAS LEAK

    Click here