AIR CONDITIONING SYSTEM PTC Heater Circuit

DESCRIPTION

The air conditioning amplifier assembly sends operation signals to the PTC heater relays when quick heater assembly operation conditions are met. Based on the signals from the air conditioning amplifier assembly, the PTC heater relays turn on, and power is supplied to the quick heater assembly installed in the air conditioning radiator assembly.

Quick Heater Assembly Operation Condition
Control ECU Condition
Air Conditioning Amplifier Assembly Power switch on (READY)
Combination switch assembly (ECO mode switch) off
Blower switch: on
Temperature settings: MAX HOT

IDH terminal signal less than 1 V

(Inverter with converter assembly overload not detected)


  • Engine coolant temperature 60°C (140°F) or lower (2 PTC heater relays operating)

  • Engine coolant temperature 64°C (147°F) or lower (1 PTC heater relay operating)

Ambient temperature 10°C (50°F) or lower

WIRING DIAGRAM

B003YS7E05

CAUTION / NOTICE / HINT

Note


  • Inspect the fuses for circuits related to this system before performing the following procedure.

  • If the auxiliary battery voltage is low, the PTC heater may not operate. When "Operation of Electrical Items Restricted." is displayed on the multi-information display in the combination meter assembly, inspect the auxiliary battery, referring to On-vehicle Inspection for the charging system.

    Click here

  • If the auxiliary battery voltage is low, the PTC heater may not operate. When "Operation of Electrical Items Restricted." is not displayed on the multi-information display in the combination meter assembly, check the Data List item "Battery Control Count (Body ECU)".

    Click here

PROCEDURE


  1. PERFORM ACTIVE TEST USING GTS


    1. Connect the GTS to the DLC3.

    2. Turn the power switch on (IG).

    3. Turn the GTS on.

    4. Enter the following menus: Body Electrical / Air Conditioner / Active Test.

    5. Check the operation by referring to the table below.


      Body Electrical > Air Conditioner > Active Test
      Tester Display Measurement Item Control Range Diagnostic Note
      Heater Active Level Quick heater assembly Min.: 0, Max.: 2 -

      Body Electrical > Air Conditioner > Active Test
      Tester Display
      Heater Active Level
      OK
      Heater Active Level changes normally.
      Result
      Proceed to
      OK
      NG

    NG
    OK
  2. INSPECT PTC HEATER RELAY


    1. Remove the PTC heater relays.

    2. B003YNRC02
      *a

      Component without harness connected

      (PTC Heater Relay)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      3 - 5 Auxiliary battery voltage is not applied between terminals 1 and 2 10 kΩ or higher
      3 - 5 Auxiliary battery voltage is applied between terminals 1 and 2 Below 1 Ω
      Result
      Proceed to
      OK
      NG

    NG
    OK
  3. CHECK HARNESS AND CONNECTOR (PTC HEATER RELAY - POWER SOURCE)


    1. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      PTC HTR NO. 1
      Tester Connection Condition Specified Condition
      Relay terminal 5 - Body ground Power switch off 11 to 14 V
      Relay terminal 1 - Body ground Power switch off Below 1 V
      Relay terminal 1 - Body ground Power switch on (IG) 11 to 14 V
      Standard Voltage
      PTC HTR NO. 2
      Tester Connection Condition Specified Condition
      Relay terminal 5 - Body ground Power switch off 11 to 14 V
      Relay terminal 1 - Body ground Power switch off Below 1 V
      Relay terminal 1 - Body ground Power switch on (IG) 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  4. CHECK HARNESS AND CONNECTOR (PTC HEATER RELAY - AIR CONDITIONING AMPLIFIER ASSEMBLY)


    1. Disconnect the K10 air conditioning amplifier assembly connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      PTC HTR NO. 1
      Tester Connection Condition Specified Condition
      Relay terminal 2 - K10-8 (PTC1) Always Below 1 Ω
      Relay terminal 2 - Body ground Always 10 kΩ or higher
      Standard Resistance
      PTC HTR NO. 2
      Tester Connection Condition Specified Condition
      Relay terminal 2 - K10-26 (PTC2) Always Below 1 Ω
      Relay terminal 2 - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  5. CHECK HARNESS AND CONNECTOR (PTC HEATER RELAY - QUICK HEATER ASSEMBLY AND BODY GROUND)


    1. Disconnect the K13 and K14 quick heater assembly connectors.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      PTC HTR NO. 1
      Tester Connection Condition Specified Condition
      Relay terminal 3 - K13-2 (B) Always Below 1 Ω
      K13-1 (E) - Body ground Always Below 1 Ω
      K13-2 (B) - Body ground Always 10 kΩ or higher
      Standard Resistance
      PTC HTR NO. 2
      Tester Connection Condition Specified Condition
      Relay terminal 3 - K14-2 (B) Always Below 1 Ω
      K14-1 (E) - Body ground Always Below 1 Ω
      K14-2 (B) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  6. INSPECT QUICK HEATER ASSEMBLY


    1. Remove the quick heater assembly.

      Click here

    2. B003YR1C03
      *a

      Component without harness connected

      (Quick Heater Assembly)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      K13-1 (E) - K13-2 (B) Always Below 1 Ω
      A14-1 (E) - K14-2 (B) Always Below 1 Ω
      K13-1 (E) - A14-1 (E) Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG