SHIFT LEVER ADJUSTMENT

PROCEDURE


  1. REMOVE FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)

    Click here

  2. REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR

    Click here

  3. ADJUST SHIFT LEVER POSITION


    1. Move the shift lever to N.

    2. A01MUPJC01
      *a Lever

      Remove the nut and separate the floor shift gear shifting rod sub-assembly from the lever of the transmission floor shift assembly.

    3. A001HNVC01
      *1 Transmission Control Shaft Lever RH
      *a P
      *b R
      *c N

      Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.

    4. A001I6OC02
      *a Lever
      B003U82 Pushing the lever rearward

      Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.

    5. Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.

      Torque:
      12.8 N*m  { 131 kgf*cm, 9 ft.*lbf }

      Note

      Do not push the lever of the transmission floor shift assembly too hard.

  4. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    Click here

  5. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)

    Click here

  6. INSPECT SHIFT LEVER POSITION

    Click here

  7. INSPECT FOR EXHAUST GAS LEAK

    Click here