VALVE BODY ASSEMBLY REASSEMBLY

PROCEDURE


  1. INSTALL SHIFT SOLENOID VALVE S3


    1. A01MUVG

      Install the shift solenoid valve S3 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL SHIFT SOLENOID VALVE S2


    1. A01MVDI

      Install the shift solenoid valve S2.

  3. INSTALL SHIFT SOLENOID VALVE S4


    1. A01MX5B

      Install the shift solenoid valve S4 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  4. INSTALL SHIFT SOLENOID VALVE S1


    1. A01MX7G

      Install the shift solenoid valve S1 with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  5. INSTALL SHIFT SOLENOID VALVE SR


    1. A01MVNZ

      Install the shift solenoid valve SR with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  6. INSTALL SHIFT SOLENOID VALVE SL1


    1. A01MZ9H

      Install the shift solenoid valve SL1.

  7. INSTALL SHIFT SOLENOID VALVE SLT


    1. A01MXOG

      Install the shift solenoid valve SLT.

    2. Install the 2 straight pins and lock plate with the bolt.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
  8. INSTALL SHIFT SOLENOID VALVE SLU


    1. A01MX67

      Install the shift solenoid valve SLU.

  9. INSTALL SHIFT SOLENOID VALVE SL2


    1. A01MXYA

      Install the shift solenoid valve SL2.

    2. Install the 2 straight pins and lock plate with the bolt.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }