AUTOMATIC TRANSMISSION SYSTEM, Diagnostic DTC:P2716

DTC Code DTC Name
P2716 Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT)

DESCRIPTION

Refer to DTC P0894.

Click here

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory
P2716 Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT) Open or short is detected in shift solenoid valve SLT circuit for 1 second or more while driving (1-trip detection logic).
  • Open or short in shift solenoid valve SLT circuit

  • Shift solenoid valve SLT

  • ECM

Comes on DTC stored

MONITOR DESCRIPTION

When an open or short in the linear solenoid valve (SLT) circuit is detected, the ECM interprets this as a malfunction. The ECM will turn on the MIL and store the DTC.

WIRING DIAGRAM

A01MV6EE12
*a Shift Solenoid Valve SLT
*b Transmission Wire

CAUTION / NOTICE / HINT

Note

Perform registration and/or initialization when parts related to the automatic transmission are replaced.

Click here

PROCEDURE


  1. INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SLT)


    1. A01MVFBC71
      *a

      Component without harness connected

      (Transmission Wire)

      Disconnect the transmission wire connector from the transmission.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      13 (SLT+) - 5 (SLT-) 20°C (68°F) 5.0 to 5.6 Ω
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for short)
      Tester Connection Condition Specified Condition
      13 (SLT+) - Body ground Always 10 kΩ or higher
      5 (SLT-) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)


    1. A01MVLQC03
      *a

      Rear view of wire harness connector

      (to ECM)

      Connect the transmission wire connector to the transmission.

    2. Disconnect the F3 ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      F3-5 (SLT+) - F3-4 (SLT-) 20°C (68°F) 5.0 to 5.6 Ω
    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for short)
      Tester Connection Condition Specified Condition
      F3-5 (SLT+) - Body ground Always 10 kΩ or higher
      F3-4 (SLT-) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    OK
    NG
  3. INSPECT SHIFT SOLENOID VALVE SLT


    1. A01MYNLC42
      *a Shift Solenoid Valve SLT

      Remove the shift solenoid valve SLT.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    3. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve. OK:

      OK
      The solenoid makes an operating sound.
      Result
      Proceed to
      OK
      NG

    OK
    NG