PROCEDURE
REMOVE FRONT EXHAUST PIPE ASSEMBLY (for 2GR-FKS)
REMOVE FRONT EXHAUST PIPE ASSEMBLY (for 8AR-FTS)
REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR
ADJUST SHIFT LEVER POSITION
Move the shift lever to N.
| *a | Lever |
Remove the nut and separate the floor shift gear shifting rod sub-assembly from the lever of the transmission floor shift assembly.
| *1 | Transmission Control Shaft Lever RH |
| *a | P |
| *b | R |
| *c | N |
Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
| *a | Lever |
|
Pushing the lever rearward |
Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.
Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.
Note
Do not push the lever of the transmission floor shift assembly too hard.
INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GR-FKS)
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 8AR-FTS)
INSPECT SHIFT LEVER POSITION
INSPECT FOR EXHAUST GAS LEAK (for 2GR-FKS)
INSPECT FOR EXHAUST GAS LEAK (for 8AR-FTS)