PROCEDURE
INSTALL ENGINE COOLANT TEMPERATURE SENSOR
INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
INSTALL IGNITION COIL ASSEMBLY
INSTALL FUEL INJECTOR SEAL
INSTALL FUEL INJECTOR ASSEMBLY (for Direct Injection)
INSTALL FUEL DELIVERY PIPE RH
INSTALL FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY LH
INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY
TEMPORARILY INSTALL FUEL PUMP ASSEMBLY
TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
INSTALL FUEL PUMP ASSEMBLY
INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
INSTALL INTAKE MANIFOLD
INSTALL FUEL INJECTOR ASSEMBLY (for Port Injection)
INSTALL FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY
INSTALL WATER PUMP PULLEY
INSTALL WIRE HARNESS CLAMP BRACKET
| *A | w/o Oil Cooler | - | - |
| *a | Front Side | *b | Upper Side |
| *c | Rear Side | - | - |
|
Bolt | |
Nut |
|
V-bank Cover Bracket | - | - |
Install the wire harness clamp bracket with the V-bank cover bracket (A).
Install the V-bank cover bracket (B).
Install the 14 wire harness clamp brackets with the 14 bolts.
w/o Oil Cooler:
Install the wire harness clamp bracket with the nut.
Install the wire harness clamp bracket with the bolt.
INSTALL NO. 11 WATER BY-PASS HOSE
Install the No. 11 water by-pass hose to the No. 1 water outlet pipe and slide the clip to secure it.
INSTALL NO. 10 WATER BY-PASS HOSE
Install the No. 10 water by-pass hose to the rear water by-pass joint and slide the clip to secure it.
INSTALL NO. 2 WATER BY-PASS PIPE
Install the No. 2 water by-pass pipe and slide the 2 clips to secure them.
Install the bolt.
INSTALL NO. 1 WATER BY-PASS PIPE (w/ Oil Cooler)
Install the No. 1 water by-pass pipe with the 2 bolts and nut.
Connect the 4 water hoses and slide the 4 clips to secure the 4 hoses.
INSTALL WATER INLET CAP (w/o Oil Cooler)
Install the water inlet cap to the water inlet sub-assembly and slide the clip to secure it.
INSTALL WATER BY-PASS HOSE
Install the water by-pass hose to the rear water by-pass joint and slide the clip to secure it.
INSTALL NO. 2 WATER BY-PASS HOSE ASSEMBLY
Install the No. 2 water by-pass hose assembly and slide the 2 clips to secure them.
Engage the 3 clamps.
INSTALL NO. 3 WATER BY-PASS HOSE
Install the No. 3 water by-pass hose and slide the 2 clips to secure them.
INSTALL NO. 2 WATER BY-PASS HOSE
Install the No. 2 water by-pass hose and slide the 2 clips to secure them.
INSTALL NO. 6 WATER BY-PASS HOSE
Install the No. 6 water by-pass hose and slide the 2 clips to secure them.
INSTALL ENGINE WIRE
Install the engine wire to the engine assembly.
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Install the V-ribbed belt tensioner assembly with the 2 bolts.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Install the No. 2 idler pulley sub-assembly with the bolt.
INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET
Install the No. 1 compressor mounting bracket with the 2 bolts.
INSTALL COMPRESSOR AND MAGNETIC CLUTCH
INSTALL GENERATOR ASSEMBLY
INSTALL V-RIBBED BELT
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 4 bolts.
Engage the 2 clamps.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
INSTALL INTAKE AIR SURGE TANK ASSEMBLY