ENGINE UNIT INSTALLATION

PROCEDURE


  1. INSTALL THERMOSTAT (for Cylinder Block)

    Click here

  2. INSTALL WATER INLET HOUSING SUB-ASSEMBLY

    Click here

  3. INSTALL OIL PRESSURE SWITCHING VALVE ASSEMBLY

    Click here

  4. INSTALL NO. 4 WATER BY-PASS PIPE


    1. Install a new gasket to the water inlet housing.

    2. Install the No. 4 water by-pass pipe to the cylinder block sub-assembly and water inlet housing with the bolt and 2 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the No. 4 water by-pass pipe to the oil cooler assembly and slide the clip to secure it.

  5. INSTALL NO. 1 WATER BY-PASS PIPE

    Click here

  6. INSTALL NO. 9 ENGINE WIRE


    1. Install the No. 9 engine wire to the No. 1 water by-pass pipe and water inlet housing with the 3 clamps.

    2. Connect the oil pressure switching valve assembly connector.

  7. INSTALL VACUUM PUMP ASSEMBLY

    Click here

  8. INSTALL FUEL INJECTOR SEAL (for Direct Injection)

    Click here

  9. INSTALL DIRECT FUEL INJECTOR ASSEMBLY

    Click here

  10. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY (for Direct Injection)

    Click here

  11. INSTALL PORT FUEL INJECTOR ASSEMBLY

    Click here

  12. INSTALL FUEL DELIVERY PIPE (for Port Injection)

    Click here

  13. TEMPORARILY INSTALL FUEL PUMP ASSEMBLY (for High Pressure)

    Click here

  14. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY (for High Pressure)

    Click here

  15. INSTALL FUEL PUMP ASSEMBLY (for High Pressure)

    Click here

  16. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY (for High Pressure)

    Click here

  17. INSTALL AIR CLEANER BRACKET

    Click here

  18. INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY

    Click here

  19. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

    Click here

  20. INSTALL IDLER PULLEY SUB-ASSEMBLY

    Click here

  21. INSTALL OIL FILLER CAP GASKET


    1. Install the oil filler cap gasket to the oil filler cap sub-assembly.

  22. INSTALL OIL FILLER CAP SUB-ASSEMBLY


    1. Install the oil filler cap sub-assembly to the cylinder head cover sub-assembly.

  23. INSTALL WIRE HARNESS CLAMP BRACKET


    1. for Engine Front Side:


      1. Install the wire harness clamp bracket to the timing chain cover assembly with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      2. Connect the oil pressure sender gauge assembly connector.

    2. for Engine Upper Side:


      1. Install the wire harness clamp bracket to the cylinder head cover sub-assembly with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. for Engine RH Side:


      1. Install the 2 wire harness clamp brackets to the stiffening crankcase assembly with the 2 bolts.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. for Engine Rear Side:


      1. Install the wire harness clamp bracket to the cylinder head sub-assembly with the bolt.

        Torque:
        10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  24. INSTALL SENSOR WIRE


    1. Install the sensor wire to the fuel delivery pipe sub-assembly with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 4 direct fuel injector assembly connectors.

    3. Connect the fuel pressure sensor connector.

  25. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  26. INSTALL TURBOCHARGER SUB-ASSEMBLY

    Click here

  27. CONNECT INLET TURBO OIL PIPE SUB-ASSEMBLY

    Click here

  28. INSTALL HEAT INSULATOR BRACKET

    Click here

  29. INSTALL OUTLET COMPRESSOR ELBOW


    1. Install a new gasket to the turbocharger sub-assembly.

    2. Install the outlet compressor elbow to the turbocharger sub-assembly with the 2 nuts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }
  30. INSTALL NO. 5 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  31. INSTALL NO. 4 VENTILATION HOSE

    Click here

  32. INSTALL VENTILATION HOSE

    Click here

  33. INSTALL IGNITION COIL ASSEMBLY

    Click here

  34. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


    1. Install a new O-ring to the engine oil level dipstick guide.

    2. Apply a light coat of engine oil to the O-ring.

    3. Install the engine oil level dipstick guide with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. Install the engine oil level dipstick.

  35. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH


    1. Install the front No. 1 engine mounting bracket RH to the cylinder block sub-assembly with the 4 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  36. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH


    1. Install the front No. 1 engine mounting bracket LH to the cylinder block sub-assembly with the 4 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  37. INSTALL FRONT ENGINE MOUNTING HEAT INSULATOR LH (w/ Front Engine Mounting Heat Insulator LH)


    1. Install the front engine mounting heat insulator LH to the front No. 1 engine mounting bracket LH with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  38. INSTALL INTAKE MANIFOLD WITH INTERCOOLER ASSEMBLY AND THROTTLE WITH MOTOR BODY ASSEMBLY


    1. Install 2 new No. 1 intake manifold to head gaskets to the intake manifold with intercooler assembly and throttle with motor body assembly.

    2. B003WNZN01

      Temporarily install the intake manifold with intercooler assembly and throttle with motor body assembly with the 4 bolts and 2 nuts.

    3. Tighten the 4 bolts and 2 nuts in the order shown in the illustration to install the intake manifold with intercooler assembly and throttle with motor body assembly.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    4. Install the wire harness clamp bracket to the intake manifold with intercooler assembly and throttle with motor body assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  39. CONNECT NO. 3 WATER BY-PASS HOSE


    1. Connect the No. 3 water by-pass hose to the water outlet sub-assembly and slide the clip to secure it.

    2. Engage the clamp to the engine oil level dipstick guide.

  40. INSTALL NO. 2 VENTILATION HOSE

    Click here

  41. CONNECT VACUUM TRANSMITTING HOSE ASSEMBLY

    Click here

  42. CONNECT NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY

    Click here

  43. INSTALL PURGE VALVE (PURGE VSV)


  44. INSTALL WATER BY-PASS PIPE ASSEMBLY


    1. Install the water by-pass pipe assembly to the intercooler assembly and No. 2 air tube with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 9 water by-pass hose to the intercooler assembly and slide the clip to secure it.

    3. Connect the No. 2 turbo water hose to the No. 1 turbo water pipe sub-assembly and slide the clip to secure it.

  45. INSTALL NO. 2 WATER BY-PASS PIPE

    Click here

  46. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

    Click here

  47. INSTALL COMPRESSOR AND MAGNETIC CLUTCH

    Click here

  48. INSTALL GENERATOR ASSEMBLY

    Click here