ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. B003UYM

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL ENGINE ROOM ECU COVER


    1. Install the engine room ECU cover with the 3 bolts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Note

      Make sure that the wire harness does not get caught between the parts.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  6. PERFORM INITIALIZATION