СТАРТЕР УСТАНОВКА

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      64 N*m  { 653 kgf*cm, 47 ft.*lbf }
    2. Install the starter wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Close the terminal cap.

    4. Connect the starter connector.

  2. INSTALL NO. 3 AIR HOSE

    Click here

  3. INSTALL NO. 1 AIR TUBE


    1. Install the No. 1 air tube with the 2 bolts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }
    2. Tighten the 2 clamps.

      Torque:
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }
    3. Attach the 2 clamps.

    4. Install the bolt and attach the clamp.

      Torque:
      7.7 N*m  { 79 kgf*cm, 68 in.*lbf }
  4. INSTALL AIR CLEANER BRACKET

    Click here

  5. CONNECT FUEL FILTER ASSEMBLY


    1. Connect the fuel filter assembly with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  6. INSTALL AIR CLEANER SUPPORT

    Click here

  7. INSTALL AIR CLEANER CASE

    Click here

  8. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  9. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  10. INSTALL BATTERY BRACKET REINFORCEMENT

    Click here

  11. INSTALL FRONT BATTERY BRACKET

    Click here

  12. INSTALL BATTERY TRAY

  13. INSTALL BATTERY

  14. INSTALL BATTERY INSULATOR

  15. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  16. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  17. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  18. INSTALL NO. 1 ENGINE COVER

    Click here

  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  20. CLEAR NUMBER OF STARTER OPERATIONS

    Click here