СВЕЧА НАКАЛИВАНИЯ УСТАНОВКА

PROCEDURE


  1. INSTALL GLOW PLUG ASSEMBLY


    1. B00297FC01
      *1 Color (White)
      *2 Mark (7V)

      Check the insulator color and the mark on each glow plug, and then, using a 10 mm deep socket wrench, install the 4 glow plugs.

      Torque:
      12 N*m  { 125 kgf*cm, 9 ft.*lbf }

      Note

      As the engine may be damaged, do not install any glow plug other than the type indicated in the illustration.

  2. INSTALL NO. 1 GLOW PLUG CONNECTOR


    1. Install the No. 1 glow plug connector with the 4 nuts.

      Torque:
      2.2 N*m  { 22 kgf*cm, 19 in.*lbf }
    2. Attach the clamp and connect the glow plug connector to the bracket.

    3. Install the 4 screw grommets.

  3. INSTALL ENGINE COVER BRACKET


    1. B002A87C01

      Temporarily install the engine wire with the bolt labeled A in the illustration.

    2. Temporarily install the engine cover bracket with the nut and the bolt labeled B in the illustration.

    3. Tighten the 2 bolts and nut.

      Torque:
      for bolt A
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
      for bolt B
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      for nut
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    4. Connect the glow plug connector.

  4. INSTALL NO. 2 EGR PIPE SUB-ASSEMBLY

    Click here

  5. INSTALL NO. 1 ENGINE COVER

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here