HEATER EXHAUST PIPE INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 EXHAUST PIPE SUB-ASSEMBLY


    1. Install the 2 new gaskets to the No. 1 exhaust pipe sub-assembly.

    2. Install the No. 1 exhaust pipe sub-assembly with the 2 bolts and nut.

      Torque:
      for Bolt
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
      for Nut
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  2. INSTALL NO. 2 EXHAUST PIPE SUB-ASSEMBLY