DOOR CONTROL RELAY INSTALLATION

PROCEDURE


  1. INSTALL DOUBLE LOCK DOOR CONTROL RELAY ASSEMBLY


    1. Attach the 2 claws to install the double lock door control relay assembly.

  2. INSTALL ECU INTEGRATION BOX RH


    1. A01CXFG

      Install the ECU integration box RH with the 2 nuts and bolt.

      Torque:
      for Nut
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
      for Bolt
      11.5 N*m  { 117 kgf*cm, 8 ft.*lbf }
    2. A01CXC5

      Connect each connector.

    3. Attach the clamp.

  3. INSTALL FUSE BOX OPENING COVER

    Click here