PROCEDURE
INSTALL NETWORK GATEWAY ECU
Insert the network gateway ECU to the ECU integration box RH.
Push in the network gateway ECU to attach the 2 claws.
INSTALL ECU INTEGRATION BOX RH
INSTALL FUSE BOX OPENING COVER
INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.