GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      7.7 N*m  { 79 kgf*cm, 68 in.*lbf }
    2. A01GBD0

      Temporarily install the generator with the bolt.

    3. A01GBOE

      Temporarily install the adjusting bar with the 2 bolts.

    4. Install the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    5. Install the terminal cap.

    6. Connect the connector and attach the wire harness clamp.

    7. A01GD4Z

      Tighten the bolt.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
  2. INSTALL V-RIBBED BELT

    Click here

  3. ADJUST V-RIBBED BELT

    Click here

  4. INSPECT V-RIBBED BELT

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  6. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  7. INSTALL NO. 1 ENGINE UNDER COVER

    Click here

  8. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here