GENERATOR(for 150 A Type) INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly with the 2 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. Install the wire harness clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap.

    5. Connect the generator connector.

  2. INSTALL WIRE HARNESS CLAMP BRACKET


    1. Install the wire harness clamp bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Attach the wire harness clamp to the wire harness clamp bracket.

  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here