TRANSFER ASSEMBLY INSTALLATION

PROCEDURE


  1. INSTALL TRANSFER AND TRANSAXLE SETTING STUD BOLT


  2. INSTALL TRANSFER ASSEMBLY


    1. for U660F, U760F, EA64F, EB61F, EB63F, K114F:


      1. A01V75U

        Clean the bolt holes.

      2. Install the transfer to the transaxle with the 6 nuts and 2 bolts.

        Torque:
        68.6 N*m  { 700 kgf*cm, 51 ft.*lbf }
    2. for K111F:

      Install the transfer to the transaxle with the 6 nuts.

      Torque:
      68.6 N*m  { 700 kgf*cm, 51 ft.*lbf }
  3. INSTALL REAR ENGINE MOUNTING BRACKET


  4. INSTALL CONTINUOUSLY VARIABLE TRANSAXLE ASSEMBLY (for K114F)

    Click here

  5. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE


  6. ADD TRANSFER OIL

    Click here

  7. INSPECT TRANSFER OIL

    Click here