OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION OIL COOLER BRACKET


    1. A01QTG2N01

      Install the transmission oil cooler bracket to the continuously variable transaxle assembly with the 3 bolts.

      Torque:
      13.5 N*m  { 138 kgf*cm, 10 ft.*lbf }

      Note

      Tightening order: Temporarily install bolt (A) → Tighten bolt (B) → Tighten bolt (C) → Tighten bolt (A)

  2. INSTALL OIL COOLER


    1. A01QR9TN01

      Install the oil cooler to the transmission oil cooler bracket with the 2 bolts.

      Torque:
      13.5 N*m  { 138 kgf*cm, 10 ft.*lbf }

      Note

      Tightening order: Temporarily install bolt (A) → Tighten bolt (B) → Tighten bolt (A)

  3. CONNECT NO. 1 TRANSMISSION OIL COOLER HOSE


    1. Connect the No. 1 transmission oil cooler hose to the oil cooler, and slide the clip to secure the hose.

      Note


      • Align each paint mark on the No. 1 transmission oil cooler hose with each one on the oil cooler.

      • Fully insert the No. 1 transmission oil cooler hose to the 2nd rib on each oil cooler pipe.

  4. CONNECT NO. 2 TRANSMISSION OIL COOLER HOSE


    1. Connect the No. 2 transmission oil cooler hose to the oil cooler, and slide the clip to secure the hose.

      Note


      • Align each paint mark on the No. 2 transmission oil cooler hose with each one on the oil cooler.

      • Fully insert the No. 2 transmission oil cooler hose to the 2nd rib on each oil cooler pipe.

  5. CONNECT NO. 3 WATER BY-PASS HOSE


    1. Connect the No. 3 water by-pass hose to the oil cooler, and slide the clip to secure the hose.

      Note


      • Align each paint mark on the No. 3 water by-pass hose with each one on the oil cooler.

      • Fully insert the No. 3 water by-pass hose to the 2nd rib on each oil cooler pipe.

  6. CONNECT NO. 5 WATER BY-PASS HOSE


    1. Connect the No. 5 water by-pass hose to the oil cooler, and slide the clip to secure the hose.

      Note


      • Align each paint mark on the No. 5 water by-pass hose with each one on the oil cooler.

      • Fully insert the No. 5 water by-pass hose to the 2nd rib on each oil cooler pipe.

  7. ADD ENGINE COOLANT

    Click here

  8. INSPECT FOR COOLANT LEAK

    Click here

  9. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  10. INSPECT FOR FLUID LEAK

  11. INSTALL REAR ENGINE UNDER COVER LH

    Click here

  12. INSTALL NO. 1 ENGINE UNDER COVER

    Click here