PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Install the park/neutral position switch assembly to the continuously variable transaxle assembly.
Temporarily install the 2 bolts.
Install a new lock plate and the lock nut to the park/neutral position switch assembly.
Temporarily install the control shaft lever.
Turn the lever clockwise until it stops, and then turn it counterclockwise 2 notches.
Remove the control shaft lever.
| *a | Neutral Basic Line |
| *b | Protrusion |
Align the protrusion with the neutral basic line.
Hold the switch in that position and tighten the 2 bolts.
Using a screwdriver, bend the tabs of the lock plate.
Install the control shaft lever with the washer and nut.
Connect the park/neutral position switch connector.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the control shaft lever with the nut.
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
INSTALL NO. 1 ENGINE UNDER COVER
for 3ZR-FE:
for 3ZR-FAE: