REVOLUTION SENSOR INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION REVOLUTION SENSOR (NOUT)

    A01QSKN

    1. Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor (NOUT).

    2. Install the transmission revolution sensor (NOUT) with the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    3. Connect the transmission revolution sensor connector.

  2. INSTALL TRANSMISSION REVOLUTION SENSOR (NIN)

    A01QSVS

    1. Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor (NIN).

    2. Install the transmission revolution sensor (NIN) with the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    3. Connect the transmission revolution sensor connector.

  3. INSTALL TRANSMISSION REVOLUTION SENSOR (NT)

    A01QQJD

    1. Coat a new O-ring with CVT Fluid TC and install it to the transmission revolution sensor (NT).

    2. Install the transmission revolution sensor (NT) with the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    3. Connect the transmission revolution sensor connector.

  4. INSTALL BATTERY BRACKET REINFORCEMENT

    Click here

  5. INSTALL FRONT BATTERY BRACKET

    Click here

  6. INSTALL BATTERY TRAY

  7. INSTALL BATTERY

  8. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  9. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  10. INSTALL AIR CLEANER FILTER ELEMENT

  11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  12. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  14. INSTALL NO. 2 CYLINDER HEAD COVER

    Click here