PROCEDURE
INSTALL OIL PUMP ASSEMBLY
Install the oil pump with the 3 bolts.
INSTALL NO. 2 OIL PAN SUB-ASSEMBLY
| *1 | Seal Packing |
| *a | 3.0 to 4.5 mm (0.118 to 0.177 in.) |
| *b | 6.0 mm (0.236 in.) |
Remove any old packing material and be careful not to drop any oil on the contact surfaces of the stiffening crankcase and No. 2 oil pan sub-assembly.
Apply seal packing in a continuous line as shown in the illustration.
| Application Specification | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| Seal packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
Note
Remove any oil from the contact surfaces.
Install the No. 2 oil pan sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not add engine oil for at least 2 hours after installing the No. 2 oil pan sub-assembly.
Install the No. 2 oil pan with the 10 bolts and 2 nuts.
INSTALL NO. 2 CHAIN SUB-ASSEMBLY
Temporarily install the crankshaft pulley bolt.
Set the crankshaft key as shown in the illustration.
Turn the drive shaft so that the cutout faces upward.
Remove the crankshaft pulley bolt.
| *1 | Timing Mark |
| *2 | Mark Plate (Yellow) |
| *3 | Oil Pump Drive Gear |
| *4 | Oil Pump Drive Shaft Gear |
|
Front |
Align the yellow mark plates with the timing mark of each gear as shown in the illustration.
Install the gears onto the crankshaft and oil pump shaft with the chain on the gears.
Temporarily install the oil pump drive shaft gear with the nut.
Install the chain damper spring to the chain tensioner plate, and then install the chain tensioner plate with the bolt.
Temporarily install the crankshaft pulley with the pulley bolt.
Using SST, hold the crankshaft. Then tighten the drive shaft gear nut.
for 86 mm (3.39 in.) Bolt Pitch Type:
for 64 mm (2.52 in.) Bolt Pitch Type:
Tech Tips
For the 64 mm (2.52 in.) bolt pitch type, the part number of the installationbolt for SST (crankshaft pulley holding tool) is 91551-00850 (quantity: 2).
Remove SST, the crankshaft pulley bolt and the crankshaft pulley.
INSTALL CRANKSHAFT TIMING SPROCKET
| *a | Front |
Install the crankshaft timing sprocket as shown in the illustration.
SET NO. 1 CYLINDER TO TDC/COMPRESSION
INSTALL NO. 1 CHAIN VIBRATION DAMPER
INSTALL CHAIN SUB-ASSEMBLY
INSTALL CHAIN TENSIONER SLIPPER
INSTALL NO. 2 CHAIN VIBRATION DAMPER
Install the No. 2 chain vibration damper with the 2 bolts.
CHECK NO. 1 CYLINDER TO TDC/COMPRESSION
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
Install a new gasket.
Note
Remove any oil from the contact surface.
Install the engine water pump assembly with the 3 bolts.
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover sub-assembly, cylinder head, camshaft housing, stiffening crankcase and cylinder block.
|
Clean and Degrease | - | - |
Install 3 new O-rings.
Apply seal packing as shown in the illustration.
| *a | 5.0 mm (0.197 in.) | - | - |
| Seal packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
| Standard seal diameter |
|---|
| 5.0 mm (0.197 in.) |
Note
Remove any oil from the contact surface.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not add engine oil for at least 2 hours after installing the timing chain cover sub-assembly.
Apply seal packing to the timing chain cover sub-assembly in a continuous line as shown in the following illustration.
| *a | 2.5 mm (0.0984 in.) | *b | 2.5 to 3.5 mm (0.0984 to 0.138 in.) |
| *c | 5.0 mm (0.197 in.) | *d | 4.5 to 5.5 mm (0.177 to 0.217 in.) |
| *e | 7.5 mm (0.295 in.) | *f | 7.0 to 8.0 mm (0.276 to 0.315 in.) |
| Seal Packing | |||||||
|---|---|---|---|---|---|---|---|
|
| Application Specification | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Note
When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
After applying seal packing to the timing chain cover sub-assembly, install the engine mounting bracket and oil filter bracket within 10 minutes.
Do not add engine oil for at least 2 hours after installation.
Clean the bolts and their installation holes.
Install the timing chain cover.
Temporarily install the engine mounting bracket with the 3 bolts.
Note
Install the mounting bracket within 10 minutes after installing the timing chain cover sub-assembly.
Do not add engine oil for at least 2 hours after installation.
Install 2 new O-rings.
Temporarily install the oil filter bracket with the 4 bolts.
Note
Install the oil filter bracket within 10 minutes after installing the timing chain cover sub-assembly.
Do not add engine oil for at least 2 hours after installation.
Apply adhesive to 5 and a half threads or more of the end of bolt E.
| Adhesive |
|---|
| Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent |
Install the timing chain cover with the 26 bolts and seal washer in the order shown in the illustration.
| *1 | Seal Washer | - | - |
| *a | Torque Specification | *b | Bolt Tightening Order |
Note
When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying the seal packing.
Do not add engine oil for at least 2 hours after installation.
| Bolt Length | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Tech Tips
Apply adhesive to bolt E before installing it.
INSTALL OIL FILTER CAP ASSEMBLY
INSTALL TIMING CHAIN COVER OIL SEAL
INSTALL ENGINE MOUNTING BRACKET STUD BOLT
INSTALL CRANKSHAFT PULLEY
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
INSTALL CYLINDER HEAD COVER GASKET
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
INSTALL THERMOSTAT
INSTALL WATER INLET
CONNECT WATER INLET HOSE
INSTALL WATER BY-PASS HOSE
INSTALL NO. 1 WATER BY-PASS PIPE
INSTALL NO. 3 WATER BY-PASS HOSE
INSTALL PCV HOSE
INSTALL EXHAUST MANIFOLD
INSTALL MANIFOLD STAY
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
INSTALL IGNITION COIL ASSEMBLY
INSTALL FUEL INJECTOR ASSEMBLY
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
INSTALL FUEL TUBE SUB-ASSEMBLY
INSTALL INTAKE MANIFOLD
INSTALL VACUUM SURGE TANK
INSTALL THROTTLE BODY ASSEMBLY
REMOVE ENGINE STAND
INSTALL ENGINE ASSEMBLY WITH TRANSAXLE