ENGINE OIL COOLER(w/ Oil Cooler) INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Clean the oil cooler assembly contact surface on the cooler mounting.

    2. Apply a light coat of engine oil to 3 new gaskets.

    3. Install the 3 new gaskets to the oil cooler assembly.

    4. Temporarily install the oil cooler assembly with the union bolt, the nut and a new seal washer.

    5. A00YUJ5C01
      *1 Seal Washer
      *2 Union Bolt
      *3 Nut

      Tighten the bolt and nut in several steps in the sequence shown in the illustration.

      Torque:
      for union bolt
      60 N*m  { 612 kgf*cm, 44 ft.*lbf }
      for nut
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

    Click here

  3. ADD ENGINE OIL

    Click here

  4. ADD ENGINE COOLANT

    Click here

  5. INSPECT ENGINE OIL LEVEL

    Click here

  6. INSPECT FOR OIL LEAK

    Click here

  7. INSPECT FOR COOLANT LEAK

    Click here