PROCEDURE
READ NUMBER OF STARTER OPERATIONS
for 1AD-FTV
for 3ZR-FAE
PRECAUTION
Note
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
REMOVE NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
REMOVE GLOVE COMPARTMENT DOOR ASSEMBLY
REMOVE ECU INTEGRATION BOX RH (for LHD)
| *1 | Nut |
| *2 | Bolt |
Disconnect each connector and clamp.
Remove the 2 nuts, bolt and ECU integration box RH.
REMOVE ENGINE STOP AND START ECU (for LHD)
Disengage the 2 claws and remove the engine stop and start ECU from the ECU integration box RH.
REMOVE ENGINE STOP AND START ECU (for RHD)
| *1 | Nut |
| *2 | Bolt |
Disconnect the 3 connectors from the engine stop and start ECU.
Remove the bolt, nut and engine stop and start ECU.