THERMOSTAT INSTALLATION

PROCEDURE


  1. INSTALL THERMOSTAT


    1. Install a new gasket to the thermostat.

    2. A01CWX2C01
      *1 Jiggle Valve

      Install the thermostat with the jiggle valve facing upward.

      Tech Tips

      The jiggle valve may be set to within 10° on either side of the prescribed position.

  2. INSTALL WATER INLET


    1. Install the water inlet with the 3 bolts.

      Torque:
      11 N*m  { 112 kgf*cm, 8 ft.*lbf }
  3. INSTALL NO. 4 WATER BY-PASS PIPE


    1. A01CYA0

      Apply soapy water to a new O-ring and install it to the No. 4 water by-pass pipe.

    2. Install the No. 4 water by-pass pipe with the bolt.

      Torque:
      11 N*m  { 112 kgf*cm, 8 ft.*lbf }
  4. CONNECT NO. 2 RADIATOR HOSE

    Click here

  5. INSTALL NO. 2 WATER BY-PASS HOSE


    1. A01CYCKC01
      *a Top
      *b RH Side
      *c Rear Side

      Install the No. 2 water by-pass hose to the No. 4 water by-pass pipe and radiator reservoir assembly, slide the 2 clamps to secure it.

      Tech Tips

      The direction of the hose clamp is indicated in the illustration.

  6. ADD ENGINE COOLANT

    Click here

  7. INSPECT FOR COOLANT LEAK

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER

    Click here