WATER PUMP INSTALLATION

PROCEDURE


  1. INSTALL ENGINE WATER PUMP ASSEMBLY


    1. Remove the adhesive from the threads of the bolt and the bolt hole of the timing chain cover sub-assembly.

    2. A01CWCQ

      Install a new gasket to the timing chain cover sub-assembly so that the protrusions indicated by the arrows in the illustration are aligned.

    3. A01CY3PN01

      Apply adhesive to 2 or 3 threads of the bolt labeled A.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
      Standard Bolt Length
      Item Specified Condition
      Bolt A and C 45 mm (1.77 in.)
      Bolt B 30 mm (1.18 in.)
    4. A01CW2J

      Install the engine water pump assembly with the 2 bolts indicated by the arrows in the illustration.

      Torque:
      23 N*m  { 229 kgf*cm, 17 ft.*lbf }
    5. A01CXWO

      Install the 5 bolts.

      Torque:
      23 N*m  { 229 kgf*cm, 17 ft.*lbf }
  2. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY


    1. Install the No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.

      Torque:
      40 N*m  { 408 kgf*cm, 30 ft.*lbf }
  3. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

    Click here

  4. INSTALL IDLER PULLEY COVER PLATE

    Click here

  5. INSTALL ENGINE MOUNTING SPACER


    1. Install the engine mounting spacer with the 2 bolts.

      Torque:
      95 N*m  { 969 kgf*cm, 70 ft.*lbf }
  6. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH


    1. Install the engine mounting insulator sub-assembly RH with the 5 bolts and nut.

      Torque:
      Bolt and Nut
      95 N*m  { 969 kgf*cm, 70 ft.*lbf }
    2. Remove the jack.

    3. Tighten the 4 bolts and 2 nuts to the front engine mounting insulator and rear engine mounting insulator.

      Torque:
      95 N*m  { 969 kgf*cm, 70 ft.*lbf }
    4. A01CXCO

      Install the nut.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
  7. INSTALL OIL PAN INSULATOR

    Click here

  8. INSTALL FAN AND GENERATOR V BELT

    Click here

  9. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH

    Click here

  10. INSTALL RADIATOR RESERVOIR ASSEMBLY

    Click here

  11. ADD ENGINE COOLANT

    Click here

  12. INSPECT FOR COOLANT LEAK

    Click here

  13. INSTALL NO. 1 ENGINE COVER

    Click here

  14. INSTALL REAR ENGINE UNDER COVER RH

    Click here

  15. INSTALL NO. 1 ENGINE UNDER COVER

    Click here