ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    3. Install the ECM with the 3 bolts.

      Torque:
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }

      Note

      Avoid physical shock to the ECM.

    4. Attach the claw and connect the relay.

    5. Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. Install the air cleaner case sub-assembly with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  4. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE


    1. Install the air cleaner cap sub-assembly to the air cleaner hose assembly and tighten the hose clamp.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Attach the 2 clamps.

    3. Connect the mass air flow meter connector and attach the wire harness clamp.

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  6. PERFORM REGISTRATION

    Click here

  7. PERFORM INITIALIZATION

    Click here