PROCEDURE
INSTALL FRONT DIFFERENTIAL RING GEAR
| *a | 90 to 100°C (194 to 212°F) |
Using a heater, heat the front differential ring gear to 90 to 100°C (194 to 212°F).
Clean the contact surface of the front No. 1 differential case sub-assembly.
| *a | Matchmark |
Aligning the matchmarks, quickly install the front differential ring gear to the front No. 1 differential case sub-assembly with the 16 bolts.
INSTALL FRONT DIFFERENTIAL CASE FRONT TAPERED ROLLER BEARING
Using SST and a press, install a new front differential case front tapered roller bearing to the front No. 1 differential case sub-assembly.
INSTALL FRONT DIFFERENTIAL CASE REAR TAPERED ROLLER BEARING
Using SST and a press, install a new front differential case rear tapered roller bearing to the front No. 1 differential case sub-assembly.