ПРОМЕЖУТОЧНЫЙ ОХЛАДИТЕЛЬ УСТАНОВКА

PROCEDURE


  1. INSTALL INTERCOOLER ASSEMBLY


    1. Install the intercooler assembly with the 4 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  2. INSTALL LOWER RADIATOR SUPPORT SUB-ASSEMBLY RH


    1. Install the lower radiator support sub-assembly RH with the 2 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL LOWER RADIATOR SUPPORT SUB-ASSEMBLY LH


    1. Install the lower radiator support sub-assembly LH with the 2 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  4. INSTALL NO. 2 AIR TUBE

    Click here

  5. INSTALL RADIATOR ASSEMBLY

    Click here

  6. CONNECT NO. 2 RADIATOR HOSE

    Click here

  7. CONNECT NO. 3 RADIATOR HOSE

    Click here

  8. INSTALL NO. 3 AIR HOSE

    Click here

  9. INSTALL INTERCOOLER AIR HOSE

    Click here

  10. CONNECT NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

    Click here

  11. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY

    Click here

  12. CONNECT NO. 1 WATER HOSE CLAMP BRACKET

    Click here

  13. CONNECT NO. 3 WATER BY-PASS HOSE

    Click here

  14. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY LH

    Click here

  15. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY RH

    Click here

  16. INSTALL RADIATOR SUPPORT LH

    Click here

  17. INSTALL RADIATOR SUPPORT RH

    Click here

  18. INSTALL RADIATOR SUPPORT TO CROSS MEMBER BRACE SUB-ASSEMBLY

    Click here

  19. INSTALL NO. 3 RADIATOR AIR GUIDE

    Click here

  20. INSTALL NO. 1 RADIATOR AIR GUIDE LH

    Click here

  21. INSTALL NO. 1 RADIATOR AIR GUIDE RH

    Click here

  22. INSTALL INJECTOR DRIVER

    Click here

  23. INSTALL BATTERY CARRIER BRACKET SUB-ASSEMBLY

    Click here

  24. INSTALL BATTERY

    Click here

  25. INSTALL THERMISTOR ASSEMBLY

    Click here

  26. INSTALL FRONT BUMPER REINFORCEMENT SUB-ASSEMBLY

    Click here

  27. INSTALL FRONT BUMPER ENERGY ABSORBER

    Click here

  28. INSTALL HEADLIGHT ASSEMBLY LH

    Click here

  29. INSTALL HEADLIGHT ASSEMBLY RH

    Tech Tips

    Use the same procedures for the RH side and LH side.

  30. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  31. ADD ENGINE COOLANT

    Click here

  32. INSPECT FOR COOLANT LEAK

    Click here

  33. INSTALL NO. 1 ENGINE UNDER COVER

    Click here