СВЕЧА НАКАЛИВАНИЯ УСТАНОВКА

PROCEDURE


  1. INSTALL GLOW PLUG ASSEMBLY


    1. Clean the glow plug assembly installation holes in the cylinder head sub-assembly.

    2. Using a 10 mm deep socket wrench, install the 4 glow plug assemblies.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. INSTALL NO. 1 GLOW PLUG CONNECTOR


    1. Install the No. 1 glow plug connector with the 4 nuts.

      Torque:
      2.2 N*m  { 22 kgf*cm, 19 in.*lbf }
    2. Connect the clamp to the bracket.

    3. Install the 4 grommets.

    4. Connect the engine wire with the bolt.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    5. Connect the glow connector.

  3. INSTALL ENGINE COVER BRACKET


    1. A012H7DC02
      *a Nut
      *b Bolt

      Install the engine cover bracket with the bolt and nut.

      Torque:
      Bolt
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      Nut
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
  4. INSTALL NO. 2 EGR PIPE SUB-ASSEMBLY

    Click here

  5. INSTALL NO. 1 ENGINE COVER

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here