ECM (для моделей с контроллером свечей накаливания) УСТАНОВКА

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. Engage the guide and install the ECM with the 2 bolts.

      Torque:
      12.5 N*m  { 127 kgf*cm, 9 ft.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. B0043KA

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL NO. 1 AIR CLEANER INLET


    1. Install the No. 1 air cleaner inlet with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  5. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  6. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

    Click here

  7. INSTALL NO. 1 ENGINE COVER (w/ No. 1 Engine Cover)

    Click here

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  9. PERFORM REGISTRATION

    Click here

  10. PERFORM INITIALIZATION

    Click here