PROCEDURE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
Install a new gasket and the diesel throttle body assembly with the 2 nuts and 2 bolts.
Connect the connector to the diesel throttle body assembly.
Connect the No. 6 water by-pass hose to the diesel throttle body assembly, and slide the clip to secure it.
Connect the No. 7 water by-pass hose to the diesel throttle body assembly, and slide the clip to secure it.
INSTALL NO. 3 AIR HOSE
| *a | Embossed Mark |
| *b | Rear |
| *c | RH |
| *d | Paint Mark |
Align the embossed mark of the throttle body with the paint mark of the No. 3 air hose.
Align the embossed mark of the No. 2 air tube within the paint mark of the No. 3 air hose.
Tighten the hose clamp of the No. 3 air hose on the diesel throttle body assembly side.
Tech Tips
Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).
Position the clamp so that distance A is 4 to 9 mm (0.157 to 0.354 in.).
Tighten the hose clamp of the No. 3 air hose on the No. 2 air tube side.
Tech Tips
Align the paint mark of the air hose with the protrusion and push in the air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).
Position the clamp so that distance A is 9 to 15 mm (0.354 to 0.591 in.).
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSTALL NO. 1 ENGINE UNDER COVER
INSTALL FRONT LOWER BUMPER ABSORBER
INSTALL NO. 1 ENGINE COVER
PERFORM INITIALIZATION