BLOWER UNIT INSTALLATION

PROCEDURE


  1. INSTALL AIR REFINER ELEMENT


    1. A01SFPF

      Install the air refiner element as shown in the illustration.

      Note

      Install the air refiner element with its UP mark oriented in the correct direction.

  2. INSTALL AIR FILTER CASE


    1. Engage the guide and claw to install the air filter case.

  3. INSTALL BLOWER ASSEMBLY


    1. Install the blower assembly with the 3 screws.

    2. Connect the connector.

    3. for Cold Area:


      1. Engage each clamp.

      2. Connect the wire harness with the screw.

  4. INSTALL NO. 3 AIR DUCT SUB-ASSEMBLY

    Click here

  5. INSTALL AIR CONDITIONER UNIT ASSEMBLY

    Click here