CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for the RH and LH sides.
The procedure described below is for the LH side.
PROCEDURE
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Standard Roof)
Note
When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
| *a | Protruding Part |
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| Dimension | Measurement |
|---|---|
| A | 3.9 mm (0.154 in.) |
| B | 4.0 mm (0.157 in.) |
| C | 2.4 mm (0.0945 in.) |
| D | 1.5 mm (0.0591 in.) |
| E | 3.4 mm (0.134 in.) |
| F | 3.6 mm (0.142 in.) |
| G | 2.6 mm (0.102 in.) |
| H | 1.2 mm (0.0472 in.) |
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.
Tech Tips
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)
Note
When installing new No. 1 roof drip side finish moulding clips, remove the double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the body and clean the body with non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to 2 new No. 1 roof drip side finish moulding clips.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
| *a | Protruding Part |
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| Dimension | Measurement |
|---|---|
| A | 4.0 mm (0.157 in.) |
| B | 4.0 mm (0.157 in.) |
| C | 2.4 mm (0.0945 in.) |
| D | 1.5 mm (0.0591 in.) |
| E | 3.4 mm (0.134 in.) |
| F | 3.6 mm (0.142 in.) |
| G | 2.6 mm (0.102 in.) |
| H | 1.2 mm (0.0472 in.) |
Install the center roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 No. 1 roof drip side finish moulding clips.
Tech Tips
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Standard Roof)
Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING (for Glass Roof)
Engage the 2 No. 1 roof drip side finish moulding clips and install the center roof drip side finish moulding.