POWER STEERING SYSTEM TS and CG Terminal Circuit

DESCRIPTION

Assist map writing can be performed after entering Signal Check by connecting the TS and CG terminals of the DLC3 using SST.

Click here

WIRING DIAGRAM

A01KRP9E03
*a Power Steering ECU Assembly

CAUTION / NOTICE / HINT

Note

If the power steering ECU assembly has been replaced with a new one, perform assist map writing and torque sensor zero point calibration.

Click here

PROCEDURE


  1. INSPECT DLC3


    1. A01KS87C03
      *a Front view of DLC3

      Turn the power switch on (IG).

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      E11-12 (TS) - E11-4 (CG) Power switch on (IG) 9 to 16 V
      Result
      Proceed to
      OK
      NG

    OK
    NG
  2. CHECK HARNESS AND CONNECTOR (POWER STEERING ECU ASSEMBLY - TS of DLC3)


    1. Disconnect the E30 power steering ECU assembly connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E11-12 (TS) - E30-6 (TS) Always Below 1 Ω
      E11-12 (TS) or E30-6 (TS) - Body ground Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  3. CHECK HARNESS AND CONNECTOR (CG of DLC3 - BODY GROUND)


    1. A01KSK2C28
      *a Front view of DLC3

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      E11-4 (CG) - Body ground Always Below 1 Ω

      Tech Tips

      If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing the part.

      Click here

      Result
      Proceed to
      OK
      NG

    OK
    NG