PROCEDURE
INSPECT CANISTER (FUEL SUCTION PLATE SUB-ASSEMBLY)
Inspect the ventilation of the canister (fuel suction plate sub-assembly).
| *a | Port A |
| *b | Port B |
| *c | Air |
Apply compressed air to the port (A) and check that air flows out from the port (B).
If the result is not as specified, replace the canister (fuel suction plate sub-assembly).
Inspect the check valve.
| *a | Port A |
| *b | Port B |
| *c | Air |
Close the port (A) and apply compressed air to the port (B).
| OK |
|---|
| Air does not flow at first. By gradually increasing the pressure, air flows when the pressure in the port reaches a certain level. |
| *a | Port A |
| *b | Port B |
Close the port (A). Using a vacuum pump, apply a vacuum to the port (B).
| OK |
|---|
| The vacuum is maintained at first. By gradually increasing the vacuum, air flows and the vacuum decreases after the vacuum reaches a certain level. |