BATTERY SMART UNIT INSTALLATION

PROCEDURE


  1. INSTALL BATTERY VOLTAGE SENSOR

    CAUTION:

    Wear insulating gloves.


    1. A013AMHC01
      *a Blue Label

      Install the battery voltage sensor to the HV battery with the bolt.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }

      Note

      Check color of the label.

    2. Connect the battery voltage sensor connector to the battery voltage sensor.

      Note

      The connector should be connected securely.

  2. INSTALL NO. 1 HYBRID VEHICLE BATTERY COVER PANEL LH

    Click here

  3. INSTALL HV BATTERY

    Click here