-
CHECK POWER MANAGEMENT CONTROL ECU (+B1, +B2 VOLTAGE)
-
Turn the power switch on (IG).
-
Measure the voltage according to the value(s) in the table below.
| Standard Voltage |
| Tester Connection |
Condition |
Specified Condition |
| A130-5 (+B1) - Body ground |
Power switch on (IG) |
11 to 14 V |
| A129-2 (+B2) - Body ground |
Power switch on (IG) |
11 to 14 V |
|
-
Turn the power switch off.
| NG |
|
CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE) Click here
|
| OK |
|
-
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
-
Disconnect the E111 and E112 power management control ECU connectors.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| E111-5 (E01) - Body ground |
Always |
Below 1 Ω |
| E111-6 (E1) - Body ground |
Always |
Below 1 Ω |
| E112-4 (E12) - Body ground |
Always |
Below 1 Ω |
| E112-5 (E02) - Body ground |
Always |
Below 1 Ω |
|
-
Reconnect the E111 and E112 power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
-
CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE)
-
Turn the power switch on (IG).
-
Measure the voltage according to the value(s) in the table below.
| Standard Voltage |
| Tester Connection |
Condition |
Specified Condition |
| A130-6 (MREL) - Body ground |
Power switch on (IG) |
11 to 14 V |
|
| NG |
|
REPLACE POWER MANAGEMENT CONTROL ECU for LHD: Click here REPLACE POWER MANAGEMENT CONTROL ECU for RHD: Click here
|
| OK |
|
-
CHECK FUSE (PM IGCT)
-
Remove the PM IGCT fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| PM IGCT fuse terminals |
Always |
Below 1 Ω |
|
| NG |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY) Click here
|
| OK |
|
-
CHECK FUSE (IGCT-MAIN)
| NG |
|
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY) Click here
|
| OK |
|
-
INSPECT RELAY (IGCT)
-
Remove the IGCT relay from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| 3 - 5 |
Auxiliary battery voltage is not applied between terminals 1 and 2 |
10 kΩ or higher |
| Auxiliary battery voltage is applied between terminals 1 and 2 |
Below 1 Ω |
|
-
Install the IGCT relay.
| NG |
|
REPLACE RELAY (IGCT)
|
| OK |
|
-
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
-
Remove the PM IGCT fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Disconnect the A129 and A130 power management control ECU connectors.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| A130-5 (+B1) - 2 (PM IGCT fuse) |
Always |
Below 1 Ω |
| A129-2 (+B2) - 2 (PM IGCT fuse) |
Always |
Below 1 Ω |
|
-
Install the PM IGCT fuse.
-
Reconnect the A129 and A130 power management control ECU connectors.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
| OK |
|
-
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
-
Remove the IGCT-MAIN fuse and PM IGCT fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Remove the IGCT relay from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| 3 (IGCT relay) - 2 (IGCT-MAIN fuse) |
Always |
Below 1 Ω |
| 5 (IGCT relay) - 1 (PM IGCT fuse) |
Always |
Below 1 Ω |
|
-
Install the IGCT-MAIN fuse and PM IGCT fuse.
-
Install the IGCT relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
| OK |
|
-
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
-
Remove the IGCT relay from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Disconnect the A130 power management control ECU connector.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| A130-6 (MREL) - 1 (IGCT relay) |
Always |
Below 1 Ω |
| A130-6 (MREL) or 1 (IGCT relay) - Body ground and other terminals |
Always |
10 kΩ or higher |
|
-
Install the IGCT relay.
-
Reconnect the A130 power management control ECU connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
| OK |
|
-
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY - BODY GROUND)
-
Remove the IGCT relay from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| 2 (IGCT relay) - Body ground |
Always |
Below 1 Ω |
|
-
Install the IGCT relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
-
CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
-
Remove the IGCT-MAIN fuse and PM IGCT fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Remove the IGCT relay from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| 3 (IGCT relay) or 2 (IGCT-MAIN fuse) - Body ground and other terminals |
Always |
10 kΩ or higher |
| 5 (IGCT relay) or 2 (PM IGCT fuse) - Body ground and other terminals |
Always |
10 kΩ or higher |
|
-
Install the IGCT-MAIN fuse and PM IGCT fuse.
-
Install the IGCT relay.
| OK |
|
REPLACE FUSE (IGCT-MAIN)
|
| NG |
|
-
REPAIR OR REPLACE HARNESS OR CONNECTOR
| NEXT |
|
REPLACE FUSE (IGCT-MAIN)
|
-
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
-
Remove the PM IGCT fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
-
Disconnect the A129 and A130 power management control ECU connectors.
-
Measure the resistance according to the value(s) in the table below.
| Standard Resistance |
| Tester Connection |
Condition |
Specified Condition |
| A130-5 (+B1) or 2 (PM IGCT fuse) - Body ground and other terminals |
Always |
10 kΩ or higher |
| A129-2 (+B2) or 2 (PM IGCT fuse) - Body ground and other terminals |
Always |
10 kΩ or higher |
|
-
Install the PM IGCT fuse.
-
Reconnect the A129 and A130 power management control ECU connectors.
| OK |
|
REPLACE FUSE (PM-IGCT)
|
| NG |
|
-
REPAIR OR REPLACE HARNESS OR CONNECTOR
| NEXT |
|
REPLACE FUSE (PM-IGCT)
|