SHIFT LEVER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY


    1. Install the transmission floor shift assembly to the shift lever support with the 3 nuts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the transmission floor shift assembly connector.

  2. INSTALL UPPER CONSOLE PANEL

    Click here

  3. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

    Click here

  4. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

    Click here

  5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    1. Using a die (M6 x P1.00 mm), clean the threads of the transmission floor shift assembly.

    2. A01G2S7

      Turn the shift lever knob in the direction of the arrow in the illustration to install it.

    3. A01G3L3C02
      *1 Measuring Point

      Using a vernier caliper, adjust the height of the shift lever knob.

      Standard height
      13.6 to 16.6 mm (0.535 to 0.654 in.)
    4. Remove the protective tape around the transmission floor shift assembly.

  6. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  7. INSTALL BATTERY BOX COVER

    Click here

  8. INSPECT SHIFT LEVER


    1. Turn the power switch on (READY).

    2. Check that all available shift positions can be selected by moving the shift lever.

      Tech Tips

      After the transmission floor shift assembly is replaced with a new one, perform the above operation. If this operation is not performed, moving the shift lever may not initially select shift positions.