ДАТЧИК ПОЛОЖЕНИЯ ПАРКИНГА / НЕЙТРАЛИ УСТАНОВКА

PROCEDURE


  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Move the shift lever to N.

    2. Temporarily install the park/neutral position switch assembly to the transaxle case with the 2 bolts.

    3. Install the lock plate and lock nut to the park/neutral position switch assembly.

      Torque:
      6.9 N*m  { 70 kgf*cm, 61 in.*lbf }
    4. Temporarily install the control shaft lever to the park/neutral position switch assembly.

    5. B00448QC01
      *a P Position
      *b N Position

      Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.

    6. Remove the control shaft lever from the park/neutral position switch assembly.

    7. B0041OOC03
      *a Neutral Basic Line
      *b Protrusion

      Align the protrusion with the neutral basic line.

    8. Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    9. B0043WA

      Using a screwdriver, bend down the tabs of the lock plate.

    10. Install the control shaft lever to the park/neutral position switch assembly with the washer and nut.

      Torque:
      12.7 N*m  { 130 kgf*cm, 9 ft.*lbf }
    11. Connect the park/neutral position switch assembly connector.

  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.

    2. Connect the transmission control cable assembly to the control shaft lever with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }

      Note

      Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in neutral.

  3. INSPECT SHIFT LEVER POSITION (for TMMT Made)

    Click here

  4. INSPECT SHIFT LEVER POSITION (for TMUK Made)

    Click here

  5. ADJUST SHIFT LEVER POSITION (for TMMT Made)

    Click here

  6. ADJUST SHIFT LEVER POSITION (for TMUK Made)

    Click here

  7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION

    Click here

  8. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY

    Click here

  9. INSTALL BATTERY CARRIER ASSEMBLY (for 1ZR-FAE)

    Click here

  10. INSTALL BATTERY (for 1ZR-FAE)

    Click here

  11. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 1ZR-FAE)

    Click here

  12. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 8NR-FTS)

    Click here

  13. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1ZR-FAE)

    Click here

  14. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE (for 8NR-FTS)

    Click here

  15. INSTALL NO. 2 CYLINDER HEAD COVER (for 1ZR-FAE)

    Click here

  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for 1ZR-FAE)

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here