МАСЛЯНЫЙ ПОДДОН УСТАНОВКА

PROCEDURE


  1. INSTALL OIL CLEANER (CVT) MAGNET


    1. A002ZKTC01
      *1 Oil Cleaner (CVT) Magnet

      Install the 3 oil cleaner (CVT) magnets to the transaxle oil (CVT) pan sub-assembly.

  2. INSTALL TRANSAXLE OIL (CVT) PAN SUB-ASSEMBLY


    1. Clean the transaxle oil (CVT) pan sub-assembly installation surface of the transaxle case.

    2. Install a new transaxle oil pan (CVT) gasket to the transaxle oil (CVT) pan sub-assembly.

    3. Install the transaxle oil (CVT) pan sub-assembly to the transaxle case with the 16 bolts.

      Torque:
      7.8 N*m  { 80 kgf*cm, 69 in.*lbf }
    4. Using a 6 mm hexagon socket wrench, install the No. 1 transmission oil filler tube to the transaxle oil (CVT) pan sub-assembly.

      Torque:
      1.7 N*m  { 17 kgf*cm, 15 in.*lbf }
    5. Using a 6 mm hexagon socket wrench, temporarily install the gasket and overflow plug to the transaxle oil (CVT) pan sub-assembly.

      Tech Tips

      Reuse the old gasket as the overflow plug will be removed again to adjust the fluid level.

  3. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

    Click here

  4. INSPECT FOR FLUID LEAK

  5. INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FAE)

    Click here

  6. INSTALL REAR ENGINE UNDER COVER LH (for 8NR-FTS)

    Click here

  7. INSTALL NO. 1 ENGINE UNDER COVER (for 1ZR-FAE)

    Click here

  8. INSTALL NO. 1 ENGINE UNDER COVER (for 8NR-FTS)

    Click here