ДАТЧИК ПЕРЕКЛЮЧЕНИЯ ПЕРЕДАЧ УСТАНОВКА

PROCEDURE


  1. INSTALL SHIFT STROKE SENSOR


    1. Apply MP grease to a new O-ring.

    2. Install the O-ring to the shift stroke sensor.

    3. A01TAE0

      Set the shift stroke senor so that the sensor side and actuator side sensor arms are positioned as shown in the illustration.

    4. Turn the shift stroke sensor clockwise.

    5. Install the 2 screws.

      Torque:
      1.3 N*m  { 13 kgf*cm, 12 in.*lbf }
    6. Connect the wire harness clamp and shift stroke sensor connector.

  2. INSTALL AIR CLEANER BRACKET

    Click here

  3. INSTALL FUEL FILTER SUPPORT

    Click here

  4. CONNECT ENGINE WIRE


    1. Connect the 2 engine wire connectors and 2 clamps.

    2. A01TBS4

      Connect the ECM connector and lower the lever.

  5. INSTALL FUEL FILTER ASSEMBLY

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  7. PERFORM INITIALIZATION OF MULTI-MODE MANUAL TRANSAXLE SYSTEM

    Click here

  8. PERFORM LEARNING OF MULTI-MODE MANUAL TRANSAXLE SYSTEM

    Click here

  9. PERFORM SYNCHRONIZATION POSITION CALIBRATION

    Click here