ТОПЛИВНЫЙ НАСОС ВЫСОКОГО ДАВЛЕНИЯ УСТАНОВКА

PROCEDURE


  1. INSTALL INJECTION PUMP ASSEMBLY


    1. Temporarily install the injection pump to the timing gear case with the 2 nuts.

    2. Temporarily install the injection pump stay to the injection pump rear end with the 3 bolts.

    3. A01XH0JE02

      Rotate the pump body to align the marks on the pump flange and timing gear case.

    4. Tighten the 2 nuts.

      Torque:
      21 N*m  { 209 kgf*cm, 15 ft.*lbf }
    5. Tighten the 3 bolts.

      Torque:
      26 N*m  { 265 kgf*cm, 19 ft.*lbf }
    6. A01XFBE

      Connect the 3 fuel hoses.

    7. Connect the 5 connectors and attach the wire harness clamp.

  2. INSTALL INJECTION PUMP DRIVE PULLEY


    1. A01XDZ6E05

      Using SST, install the injection pump drive pulley with the nut.

      SST
      09213-14010   ( 91651-60865 )
      09330-00021
      Torque:
      64 N*m  { 650 kgf*cm, 47 ft.*lbf }
  3. INSTALL INJECTION PIPE SET

    Click here

  4. INSTALL DIESEL THROTTLE BODY


    1. Install the diesel throttle body Click here.

  5. INSTALL TIMING BELT


    1. Install the timing belt Click here.

  6. BLEED INJECTION PIPE

    Click here