PROCEDURE
INSTALL DIESEL THROTTLE BODY
Place a new gasket and the diesel throttle body on the intake manifold.
Connect the throttle control motor connector.
Connect the throttle open switch connector.
INSTALL INTAKE FLANGE
Install a new gasket and the intake flange with the 3 nuts.
Connect the PCV hose.
Connect the manifold absolute pressure sensor connector.
Connect the heater water hose with the bolt.
INSTALL INTAKE PIPE
Install the intake pipe with the 2 bolts and tighten the hose clamp.
INSTALL RESONATOR WITH AIR CLEANER CAP SUB-ASSEMBLY