ECM INSTALLATION


  1. INSTALL NO. 1 ECM BRACKET


    1. Install the no. 1 ECM bracket with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the 2 wire harness clamps.

    3. Install the nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  2. INSTALL ECM


    1. Install the no. 2 ECM brackets to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Temporarily install the screw (B).

    3. B000JBLE01

      Install the ECM with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    4. Install the screw (A).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    5. Tighten the screw (B).

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    6. Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.

      • Make sure that the 2 levers are securely locked.

  3. INSTALL BATTERY


    1. Install the battery and battery tray.

    2. Install the battery clamp with the bolt and nut.

      Torque:
      Bolt
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
      Nut
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
    3. Connect the positive (+) cable to the positive (+) battery terminal.

      Torque:
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }
  4. INSTALL COOL AIR INTAKE DUCT SEAL

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  6. PERFORM INITIALIZATION

    Click here.