STARTER INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Connect the starter connector.

    3. Install the terminal nut and cover the nut with the cap.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
  2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. Connect the air cleaner cap sub-assembly to the throttle with motor body assembly with the hose clamp.

    2. Install the air cleaner cap with hose to the air cleaner case with the 2 clamps.

    3. Connect the wire harness clamp and mass air flow meter connector.

    4. Connect the 3 hoses.

    5. Connect the ventilation hose.

    6. Connect the mass air flow meter connector and wire harness clamp.

  5. INSTALL INLET NO. 1 AIR CLEANER

  6. INSTALL BATTERY

  7. INSTALL INLET NO. 2 AIR CLEANER

  8. INSTALL V-BANK COVER SUB-ASSEMBLY

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  10. INSTALL COOL AIR INTAKE DUCT SEAL