STARTER INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Connect the starter assembly connector.

    3. Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Close the terminal cap.

  2. INSTALL BATTERY


    1. Install the battery and battery tray.

    2. Install the battery clamp with the bolt and nut.

      Torque:
      Bolt
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
      Nut
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
    3. Connect the cable to the positive (+) battery terminal with the nut.

      Torque:
      6.5 N*m  { 66 kgf*cm, 58 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. B000MSNE01
      Text in Illustration
      *a Hole
      *b Projection

      Insert the projection of the air cleaner case sub-assembly into the hole of the No. 1 air cleaner bracket as shown in the illustration.

    2. Install the 2 bolts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    3. Connect the wire harness clamp.

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY


    1. Install the air cleaner filter element sub-assembly to the air cleaner case sub-assembly.

      Note

      Install the air cleaner filter element sub-assembly with the printed side facing the vehicle left.

  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE


    1. Connect the air cleaner cap with air cleaner hose to the throttle body with motor assembly.

    2. Install the air cleaner cap with air cleaner hose with the 2 guides and 2 air cleaner cap clamps.

    3. Tighten the hose clamp.

    4. Connect the union to connector tube hose to the air cleaner hose sub-assembly.

    5. Engage the wire harness clamp.

    6. Connect the mass air flow meter sub-assembly connector.

    7. Engage the ventilation hose clamp.

    8. Connect the ventilation hose to the cylinder head cover sub-assembly and slide the clip to secure it.

  6. INSTALL INLET AIR CLEANER ASSEMBLY


    1. Install the inlet air cleaner assembly with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  7. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


    1. Engage the 3 grommets to install the No. 1 engine cover sub-assembly.

  8. INSTALL COOL AIR INTAKE DUCT SEAL

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.